More loft flooring
Motivation short today, still not feeling too great.
Midday arrived with little work done but after midday I started on flooring out the other quarter of the attic.
I managed to manhandle the remaining boards into the attic. I cut a couple down to size and fitted them and working through the rest of the day I managed to get the flooring finished by midnight. Only a few sheets but this job really takes time, it’s an awkward space, it’s cold and one is always teetering on the edge of a precipice.
Anyway this was where all the remaining boxes and ephemera were being dumped. There was still a lot of work to be done, the landing platform was badly fitted, the ladders were temporary and I had an urge to double insulate it too. The door too needed refitting as the old one had been removed upon widening the loft aperture, this was chilling the entire house too, the best I could do was stuff it with insulation each evening, not ideal but a solution.
A hard day with little to show for all the effort but this would reap huge benefits in removing all the junk that was a constant bugbear and provider of hours of entertainment in shifting it from room to room.